Bathroom renovation This is a short post . The eletricista was here and ran all the channels for the new lights. Made lots of noise for a few hours. Now we await the stone we ordered for the shower floor. It will hold the drain, and is round. All the other tiles will center around this one stone, so the stone must be first. 🙂 The plumbers finished all their stuff as well. We removed the old tank toilet (which I hated) and are installing a proper toilet like they do here now. The tank is inside of the wall. You can see it here in this photo. Bathrooms are built with a space for the tank but redoing an old bathroom is harder unless you could make a space. We did that closing up a skinny storage area for it.
![](https://nancygoestoitaly.com/wp-content/uploads/2025/02/rubble-768x1024.jpg)
Here is the stone for the sink countertop, still at the marble fabricator.
![](https://nancygoestoitaly.com/wp-content/uploads/2025/02/stonesink-768x1024.jpg)
![](https://nancygoestoitaly.com/wp-content/uploads/2025/02/stone-768x1024.jpg)
This is the round shower stone with the drain.
![](https://nancygoestoitaly.com/wp-content/uploads/2025/02/drainstone-768x1024.jpg)
The muratore are down there now beavering away. They will be finishing the walls and floors, laying tiles, installing appliances. I will post again soon!
only you could say it was beautiful! hah hah. it is a wreck. can’t wait until it starts to take shape!