New kitchen – post 1

As always here in Italy. Things didn’t work out exactly as planned. The work did not begin on Wednesday. They decided to wait until Friday and all the different experts were here today.

It was noisy but not as noisy as I thought it would be. I was worried about the cats but they slept through most of it and when awake they just seemed curious. So that was a relief.

They arrived at eight. Then they put plastic up all over. They covered my piles of furniture which I had moved together for easy covering. There are multiple plastic pieces across parts of the room and the stairway is no longer usable for access. I can get there by going outside and upstairs and then in again. Only issue is my washer and drier which are behind a plastic sheet. I will have to make a way through somehow. Here are pictures. This first one is the footprint of the new kitchen from the stairway. The new floor will go in there and there will be an island and counters along the whole wall.

From the terrace window.

This is how they got all the debris out.

On the terrace is miscellaneous stuff, most of which I have no idea it’s use! And the old caldaia.

Irma just called and said the plumber will be back on Monday at eight. He will run the pipes across the floor in a trench. I’m not sure what else he will do. The next day the electrician is coming to do whatever electricians do! One thing he will need to do is move that box on the wall which is the security system. It can’t stay where it is because the cabinets will go there. I’ll be posting updates and pictures as we go along.

Buon fine weekend a tutti!

New kitchen – work begins!

Exciting times. I met with Irma, my architect, along with Alessandro and Donatello. Such pretty names for construction men. Donatello is the idraulica, plumber. He will move the pipes and gas. Alessandro will do the demolition. The work begins tomorrow. There is nothing much interesting in these pictures except to document what it looked like before the work started. First The Wall. This will be demolished.

The floors will be jackhammered up and removed. This was a conundrum for Irma. With two floors there already, how can we integrate a third? It had to kind of blend in color-wise, and also not clash with the patterns. It had to be plain. I hope what we finally settled on will look ok.

The place where the kitchen used to be which our sellers removed when they left. That is the caldaia on the left on the wall. A caldaia is a boiler. We have two. This one doesn’t work now. Most houses heat the radiators and the water with these. This means the wall is full of pipes. Water and gas for the heating system upstairs and the water. This makes demolition a bit harder. The pipes will have to be run under the floor and they will install a new caldaia outside.

Pipes.

I boxed up all our books and things and piled everything up on the two couches so they could be covered and sealed against the dust. This is just the one. The guys will roll up the carpet for me.

I don’t know how awful the noise will be yet. If it is too bad we may have to find a place to retreat to in the day time. More for the cats than us. We could always leave but they can’t unless we find a place for us all to go. Jackhammers are loud 😳.

The work will last about two months. The worst should be over in the beginning. They will completely seal the upper floor from the lower meaning to access it we will have to go out and up the elevator or stairs and then in the door upstairs. Not really all that hard. The washer and drier are up there and some plants outside which will need watering.
~~~~~~~
I have only one key to the upstairs door. I went out last week to our Ferramenta – hardware store EmporioCasa. They made two keys. They didn’t work. Back this morning. I pointed out the difference in the two keys. He made two more which looked the same to me. They didn’t work 😡 So I went back right away because I need the keys tomorrow. Finally this time they work. Whew.

The Ferramenta is a cool little place, long and skinny with two floors the bottom of which is open to the top floor. Stuff is everywhere! You don’t really browse in here. You ask for what you want. I sometimes take a picture of it and show it to them, which helps. Although the place is a jumble, the father and son and helper know where EVERYTHING is. This is outside sign. The building is right behind the train station.

You really can get just about anything here. Zoom in on these. This first one I wanted to show all the baskets they have up on the ceiling, for hunting mushrooms and truffles.

Two more. They have things seasonally. Now you’ll find heaters and fireplace tools and grates. Also pellets for the stufe. In the olive harvest season, they have rakes, and beaters, nets and the big cans the mill puts the oil in as well as smaller tins for separating it into usable sizes.

We decided to go out for lunch on Sunday, Calagrana was having a Sunday Roast and all the fixings. This is a British tradition every Sunday at all the pubs. It had been a while since we had eaten out. My appetizer was an artichoke, beet and goat cheese insalata (really good). And we had the roast. Which was not beef but lamb and pork belly. Pictures.

Ely seated us at a table next to Americans who live here part time that we had never met. Dale and Mark from Dayton Ohio. They have a house near the Niccone valley. We had a very nice time getting acquainted. They apparently had just met friends of ours a few days before Joanne and Lynne in a cafe in Passignano. There are a lot more of us around here than we know!

So stay tuned for more regular posts about the kitchen renovation. Ciao!