Here it is Friday already. We had a four day kitchen workweek. Thursday they didn’t come. They needed to let the plaster and concrete dry. We went up to check it out this afternoon after they left. It was a horrible weather day. Really high winds and torrential rains. I was surprised they worked because they cut the floor outside. The flooring is neutral and the color doesn’t clash with either of the other two floors it touches. I think that is the best we could do and it defines the space. The photos are darker because of the clouds outside.
So next steps are the grouting between the floor panels and painting the walls and ceiling. The carpenter comes Monday. I think he will be building the boxes to cover the plumbing for the caldaia and the electric breakers in the terrace side wall.
~~~~~~~
Tomorrow we are going out for lunch! We are meeting our friends Steve and Roselyne and Doug in Bevagna. The occasion is to celebrate our friend Doug’s success in passing the written test for the Italian drivers license. It is the single hardest thing an American immigrant has to accomplish to live here. And he passed! Definitely a cause for celebration. Hoping the weather will be nicer tomorrow!
Hi John, it will be nice I think. We shall see! Stay tuned.
Hi Lesle, no that is not required here,
Sleek! Coming together nicely.
When our kitchen was remodeled in California, we had to have inspections for plumbing, demo, electrical, etc before the walls, ceilings, floor etc could be closed. Does Umbria require these inspections to guarantee the work has been completed properly?